Mobile Home Permits
Instead of a residential building permit, mobile homes are permitted through mobile home permits. Please note that mobile homes built prior to July 1976 are not permitted to be moved into the City of Tallahassee, but may be relocated within City limits.
Project Details
Please note that the required project details will vary based on each project's unique characteristics.
- Setup Cost
- Septic Tank Permit Number
- New or Existing City Water and Sewer
- New or Used Manufactured Home
- Year Manufactured
- Relocated From Outside or Inside City Limits
- Serial Number
- Manufacturer
- Easements
- Number of New Driveway Connections
Project Checklist, Affidavits and Information Sheets
- Checklist
- Affidavits
- Information Sheets
Trade Permits
Depending on the work being completed, this permit may require electrical, plumbing, gas, mechanical, and/or roofing sub-trade permits.
Review Time Frame
The review time frame for a mobile home permit is 5 work days.